Pinnacle Safety and Training Blog

Confined Space Consulting at Swanbank Power Station

Bulk Flyash Grout Pty Ltd have been awarded the contract to address issues of subsidence in the Swanbank Power Station area. Void spaces in the earth can lead to collapse of the groud and lead to destruction of property and safety issues.

Bulk Flyash Grout Pty Ltd will use flowable fill technology which is a method of using a fly ash (a by-product of coal fired power stations) slurry to fill the void spaces and stabilise the earth.

Flowable fill includes a family of products usually consisting of water, fly ash, portland cement, and sometimes, coarse or fine aggregates, or both. Flowable fill is an engineered, strength controlled, fill material that is self-leveling, self-compacting and non-settling.

Pinnacle have been engaged to provide expert confined space consulting in the form of:

  1. Direct consulting in the risk management process
  2. Work site inspections
  3. Design and supply of legislative documentation i.e. safe work method statements (SWMS), rescue plans and permit system
  4. The provision of a Standby Rescue Service.

I have completed my course and would just like to say thank you so very much for all your assistance during my training. Honestly Pinnacle Safety and Training has been the absolute best RTO I have used and will definitely be doing further training with you. Your assistance and support has been second to none and I cannot praise your support enough. Again thank you and I look forward to further training with your organisation (possibly Cert IV Training and Assessment) in the very near future.

Andrew S. - Upper Coomera, QLD

Public Course Participant Diploma of Work Health and Safety