Pinnacle Safety and Training Blog
Eildon Reservoir Upgrade: Complete management of Confined Space Operations
Pinnacle were contracted by Queensland Urban Utilities and Brisbane City Works to manage all confined space operations of the Eildon Reservoir Upgrade.
Scope:
- Over seven months project timeframe
- Underground reservoir at Windsor, 100+ years old
- Still provided water to major inner city area
- Remedial works required
- Major construction works
- Strengthening roof structure etc.
We provided total site management including:
- Wrote management plans for the site
- Controlled site inductions
- Wrote all daily permits
- Ensured all work was done with lowest risk profile possible
- Conducted all gas testing
- Designed system to control locks and isolation
- Provided standby personnel
- Monitored all entry and exits (up to 16-20 workers in the confined space at any one time)
- Conducted regular evacuation drills and rescue manoeuvres
Outcomes
- Zero Harm: No incidents or accidents over entire project
Most Recent
- Pinnacle’s High Standards Secure Future Success
- 4 Reasons Why Leadership Training is Totally Worth It
- What you need to know about Schedule 26 Statutory Supervisor Training
- Is your first aid training up to date?
- Prepare your Business with Silica Awareness Training Courses
Monthly Archives
Student Links
The guys at Pinnacle were fantastic from start to finish. I’ve undertaken two courses with them over the last three months, and each time, they have provided the relevant industry information needed to achieve a pass in each class. The facility and equipment are new and current for today’s best practices in the workforce.